647-245-2405 Free Estimate

Bathroom Renovation / Burlington

Bathroom renovation in Burlington

A Burlington bathroom renovation needs enough room for the things you use every day. RenoDuck plans the shower entry, vanity depth and storage together, then connects the chosen finishes with the construction needed behind them.

RenoDuck bathroom renovation in Burlington

Your Burlington bathroom plan

Connect Your Burlington Bathroom Fixtures and Finishes

Wet Zone

Set the shower or tub arrangement before confirming glass, drain, tile and wall details.

Wide view of timber vanity and glass shower
Second bathroom ↗

Daily-Use Zone

Review vanity depth, storage, mirror, lighting and electrical needs around the people using the room.

Room Envelope

Include flooring, walls, ceiling, ventilation and repairs to adjoining finishes in the written scope.

RenoDuck portfolio

Completed RenoDuck Bathrooms to Explore

Two-Bathroom Project, Single-Vanity Room

Use these completed RenoDuck projects to explain the layout and finish details you like. These photographs show finished bathrooms you can compare. Your Burlington bathroom needs its own measurements, assessment and specification.

Explore this project gallery
Photographed in
A completed RenoDuck bathroom
Reference
Two-bathroom project, single-vanity room
Your next step
Compare with your own room dimensions and intended changes.

More Completed Bathroom Work

Open a project to see the finished room.

Real displays at our Concord showroom

Bathroom Materials, Vanities and Fixtures

Book a showroom visit

Put the shower tile, vanity finish and fittings beside one another. Check how the proposed tile format meets the niche, drain and glass opening before approving the palette.

Select a photo to enlarge it. On a small screen, swipe through the displays.

Tile sample racks at RenoDuck’s Concord showroom
Tile samples · Concord showroom
01 · Tile and finishes

Compare the Sample with Your Room

  • Ask which tile suits the shower, wall or floor.
  • Compare size, surface texture and grout colour.
  • Plan cuts, edging and the niche with the tile layout.
See tile options in person
Floating vanities, mirrors and storage displays in RenoDuck’s Concord showroom
Vanity displays · Concord showroom
02 · Vanity and storage

Try the Storage Before Choosing It

  • Compare floating and freestanding arrangements.
  • Check drawer use, cabinet depth and counter space.
  • Match the mirror and lighting to the vanity width.
Compare vanity displays
Shower fittings and faucets on the Lauretta display at RenoDuck’s showroom
Bathroom fittings · Concord showroom
03 · Shower fittings

Look at the Fittings as One Set

  • Compare the controls and the selected model’s materials.
  • Coordinate the faucet, glass hardware and drain finishes.
  • Check rain-head position against ceiling height.
See shower and faucet options

These are real showroom displays. Product models, dimensions, availability and inclusions are identified in your proposal; a photographed display does not define the package.

Bathroom construction and finishing

Shower Construction and Finishing Details

Glass walk-in shower beside a freestanding tub
Glass shower beside a freestanding tub

Shower and Tub Together

The glass shower sits beside a freestanding tub. The floor, glass and tub are planned as one layout.

Floating bathroom vanity with a lighted mirror and a single sink
Floating vanity and lighted mirror

Vanity and Mirror

The vanity is a floating cabinet with a lighted mirror and a single sink.

Behind the tile

RenoDuck’s construction approach includes DensShield tile backer. The chosen shower assembly also needs compatible treatment of joints, corners, penetrations and drain connections. At the showroom, ask to see the bathroom demo wall and discuss the assembly for your room.

Ask us to show you

Why Burlington Homeowners Choose RenoDuck

A good-looking sample still needs to work beside the other products in your room. RenoDuck’s Concord showroom brings tile, vanity and fitting choices into one visit. Completed bathroom photographs help you judge the combinations before the selections become part of the proposal.

Alex Patsula, founder and owner of RenoDuck

Founder and owner

Alex Patsula

Founded RenoDuck in 2018.

Meet the company

HomeStars Recognition

Best of Awards 2026Best of the Best 2025

Recognition on RenoDuck’s basement renovation and finishing profile.

View the award profile

15-Year Workmanship Warranty

Your written warranty sets out the coverage and exclusions for your renovation, alongside the agreed scope and product selections.

A Project Manager You Can Contact

Your project manager coordinates construction. Selections and changes are recorded in Buildertrend, with the revised work and price approved before a change proceeds.

“I decided to go with RenoDuck as their process made sense.”

Cheryl Miller · Ensuite and powder-room renovation customer
Read customer reviews

Cost, scope and current offer

Bathroom Renovation Cost in Burlington

A larger shower can change the glass, tile, drain and nearby vanity requirements at the same time. Price that group of changes together. Compare it with retaining the current fixture positions so the difference in construction work is visible.

Your written scope should identify demolition, rough work, wet-area preparation, supplied finishes, installation, design and project management. Agree any exclusions and changes before the revised work proceeds.

Published RenoDuck cost references*
Project typeCAD range
Powder room$7,000–$10,000
Tub-to-shower conversion$12,000–$15,000
Walk-in shower installation$12,000–$20,000
Basement bathroom$20,000–$35,000

*From our bathroom service guide. These are separate scope references, not Burlington quotes or the price of the pictured project. Tax treatment and complete inclusions are not specified in the guide.

See the space before your visit · RenoDuck’s showroom tour

Bring These Three Things

  1. 01 Photos of the existing bathroom
  2. 02 Approximate wall and vanity measurements
  3. 03 Your budget and the changes that matter most

Visit RenoDuck · Concord

Visit Our Concord Bathroom Showroom

Bring your Burlington bathroom photographs and measurements. We’ll help connect the tile, vanity and fitting choices to your layout. You can compare finishes side by side and use the bathroom demo wall to understand what sits behind the tile.

2501 Rutherford Rd #39–41
Concord, ON L4K 2N6

Monday–Friday · 9am–5pm
Saturday–Sunday · 10am–5pm, by appointment

Questions before travelling? 647-245-2405

Burlington Bathroom Permits and Renovation Questions

Review the Work and Approval Requirements

Burlington lists painting, decorating, millwork and replacing a fixture with the same type in the same location as exceptions. Plumbing relocations or structural changes should be reviewed before work begins.

Burlington official guidance

We review the complete scope and agree responsibility for required drawings, applications and inspections. Condo permissions, work hours and access are separate building-management requirements. Electrical work has a separate notification process through ESA.

Can I replace Burlington bathroom fixtures in the same positions?

Burlington lists replacement fixtures of the same type in the same location among permit exceptions. Confirm the complete scope if piping, walls or other systems will change.

Why select the tile and vanity together?

Their colours, dimensions and edge details meet in the finished room. Reviewing them together makes it easier to agree a complete selection record.

How long does a bathroom renovation in Burlington take?

Typical RenoDuck construction planning is about two weeks for a three-piece bathroom and three weeks for a four-piece bathroom. These estimates exclude preconstruction lead time. Scope, approvals, custom items and hidden repairs can change the schedule.

Can I compare bathroom materials before making final selections?

Yes. Arrange a visit to the Concord showroom with current room photographs, approximate dimensions and your budget. Compare tile, vanities and fittings with our team, then record the chosen products, allowances and installation details in your specifications.

Your next step

Talk Through Your Burlington Bathroom.

Book a free consultation or arrange a showroom visit with RenoDuck.

Homeowner video

Hear How the Work Went

A homeowner talks through the project after the renovation is finished. Press play, then read more on the reviews page.

More videos and reviews

Where we work

Areas We Serve

Open the city for the property. Each page covers the room, the cost, and a visit to the Concord showroom.

Questions homeowners ask

Bathroom Renovation Questions in Burlington

People ask these questions before they book a Burlington bathroom renovation. Here is how RenoDuck handles them.

How much does a bathroom renovation cost in Burlington?

A Burlington price depends on the room, whether the plumbing stays put, and the products you choose. RenoDuck's published references, which are not a quote for your room, are about $7,000 to $10,000 for a powder room, $12,000 to $15,000 for a tub-to-shower conversion, $12,000 to $20,000 for a walk-in shower, and $20,000 to $35,000 for a basement bathroom. Your written scope should list demolition, rough work, waterproofing, finishes, installation, and project management before you compare numbers.

Why do bathroom renovation quotes vary so much?

Homeowners often see a wide gap because the quotes are not for the same work. One price may keep the drains where they are, while another moves them. One may include glass, waterproofing, and disposal, while another leaves those out. Ask for tile, vanity, and fitting allowances, and ask what happens if the walls are opened and the plumbing or framing needs repair. RenoDuck records the selected products and any approved change before that extra work starts.

Do I need a permit for a bathroom renovation in Burlington?

Replacing a fixture in the same place often does not need a municipal permit. Moving a drain, changing structure, or adding electrical can. Electrical work is also reported to the Electrical Safety Authority. A condo or building manager may require a separate approval even when the city does not. RenoDuck reviews the Burlington scope with you and agrees who prepares the drawings, applications, and inspections. The municipality sets the fee and the timing.

Should I buy the tile and vanity before I hire someone?

You can look, but the room decides what fits. Door swing, vanity depth, and the shower opening matter more than a product you liked online. Bring photographs and rough measurements to RenoDuck's Concord showroom and compare the sample with the Burlington room before you order. A vanity bought first is a common reason a layout has to change.

What should I ask before I sign a bathroom contract?

Ask who manages the job, whether plumbing and electrical are done by licensed trades, and what sits behind the tile. Ask whether the price is a selected product or an allowance, how a change is approved, and what the written warranty covers. RenoDuck uses Buildertrend for selections and approved changes, and the workmanship warranty is in writing with the scope.

RenoDuck © 2026 All Right Reserved.