Condo Bathroom Renovation: A Complete Guide

5/5 - (1 vote)

Reading Time: 10-15 minutes

Key Takeaways

  • Condo bathroom renovations require condo board approvals, permits, and compliance with strict rules.
  • Smart design solutions such as wall-mounted vanities, neutral colours, and tub-to-shower conversions maximize small condo spaces.
  • The cost of a condo bathroom renovation depends on factors like bathroom size, material quality, plumbing and electrical changes, condo board requirements, and labour rates.
  • Common challenges include delays with approvals, hidden plumbing issues, and waste disposal rules.
  • Choosing an experienced condo renovation contractor ensures compliance, smoother timelines, and better results.

Renovating a bathroom in a condo comes with unique opportunities and challenges. Unlike houses, where homeowners often have full freedom to reconfigure plumbing, electrical systems, and layouts, condo bathrooms must follow strict renovation rules and board approvals. Still, a well-planned condo bathroom renovation can completely transform a compact space into a modern, efficient, and stylish retreat.

This guide walks you through the essentials: from rules and permits to design ideas, costs, and contractor selection. Whether you’re wondering “Can you renovate a condo bathroom?” or exploring modern condo bathroom ideas, the information below will help you make informed decisions and avoid costly mistakes.

A condo renovation is not just about upgrading tiles or fixtures, it’s about balancing creativity with building regulations and maximizing the limited space you have.” — Kendall, Interior Designer at RenoDuck

Can You Renovate a Condo Bathroom?

Condo Bathroom Renovation Idea

The short answer: yes, you can renovate a condo bathroom, but not without conditions. Condo corporations in Ontario and across Canada have specific bylaws that regulate what you can and cannot do. Any work that affects plumbing, electrical, or structural elements requires approval from your condo board.

Common renovation allowances

Most condo boards will approve:

  • Cosmetic updates such as painting, replacing tiles, or upgrading vanities.
  • Fixture replacements like new sinks, toilets, or tubs (provided they fit within existing plumbing layouts).
  • Tub-to-shower conversions, a popular upgrade for smaller condo bathrooms.

Renovations requiring approval or permits

  • Moving plumbing or electrical lines (requires board approval and licensed contractors).
  • Adding a bathroom to a condo (possible only in specific layouts with board approval).
  • Structural changes, such as altering walls, ceilings, or floors.

Condo Bathroom Renovation Approvals at a Glance

Not every project requires the same level of paperwork. Here’s a quick breakdown of common condo bathroom renovation tasks and whether they typically need approval.

Renovation TypeApproval RequiredTypical Difficulty
Painting or replacing tilesNoEasy
Replacing fixtures (toilet, sink)SometimesModerate
Tub-to-shower conversionYesModerate
Adding a new bathroom in a condoYesHigh
Moving plumbing or electrical linesYesHigh

This overview shows why it’s important to clarify rules with your condo board before starting. Even simple updates can require permission, and overlooking this step may lead to delays or penalties.

Condo Bathroom Renovation Rules

Condo renovation rules in Toronto and Ontario are more complex than most homeowners expect. Every condo board has its own bylaws, but there are common restrictions that apply across most buildings.

Key rules to consider:

  1. Work hours: No noisy work outside of approved daytime hours.
  2. Elevator usage: Renovation materials must be transported using service elevators.
  3. Plumbing and electrical limitations: Only licensed contractors can modify these systems.
  4. Waste disposal: Contractors must remove debris according to condo management guidelines.
  5. Permits: Electrical work typically requires an ESA (Electrical Safety Authority) permit, while plumbing or layout changes may require municipal permits.

One of the most common mistakes homeowners make is assuming condo bathrooms can be renovated like freehold homes. In reality, approvals and inspections are a mandatory step.” — Darius, Operations Manager at RenoDuck

Practical tip: Always request your condo’s renovation handbook. It outlines what is permitted, required forms, and deposit amounts. Skipping this step can lead to fines, project delays, or even being forced to undo completed work.

Planning Your Condo Bathroom Renovation Step by Step

A successful condo bathroom renovation begins with careful planning. Unlike freehold homes, condos involve coordination with building management, condo boards, and licensed contractors. Following a structured approach helps prevent delays and unexpected costs.

Define Your Needs and Budget

Before contacting a bathroom renovation contractor, outline what you want:

“Your budget should always account for both cosmetic upgrades and potential surprises behind the walls. Older condos often have plumbing or electrical systems that require upgrades.” – Stas, Project Manager at RenoDuck

Work with the Condo Board and Permits

Every condo has a set of rules — condo renovation rules Toronto and condo renovation rules Ontario are among the most common references. Obtain the renovation handbook and submit required forms for approval.

  • Electrical work requires an ESA permit.
  • Plumbing changes usually need city permits.
  • Some condos require proof of insurance from your contractor.

Hire the Right Renovation Team

Look for contractors with condo renovation experience. They know how to manage condo board approvals, use service elevators for materials, and comply with restricted work hours.

Timeline Expectations

On average, a condo bathroom renovation takes 2–4 weeks, depending on size and complexity. Factor in additional time for permits and condo board approvals.

Condo Bathroom Renovation Ideas for Small Spaces

Most condo bathrooms are compact, making design choices crucial. Smart planning can maximize every square foot while keeping the room modern and comfortable.

Space-Saving Solutions

  • Wall-mounted vanities free up floor space.
  • Glass shower enclosures instead of bulky tubs.
  • Recessed storage niches inside shower walls.
  • Light, neutral colours to make the space appear larger.

Lighting and Mirrors

Strategically placed LED lighting and oversized mirrors create the illusion of more space.

Modern Condo Bathroom Ideas

  • Floating toilets and vanities for a sleek, minimalist look.
  • Frameless glass showers with matte black fixtures.
  • Integrated smart lighting and anti-fog mirrors.

Smart Design Choices for Small Condo Bathrooms

By focusing on the features marked as best for small spaces, you can make even the most compact condo bathroom feel larger, brighter, and more functional.

FeatureSpace EfficiencyComfort/Style ImpactBest for Small Condos?
Wall-mounted vanitiesHigh – frees floor areaModerate – sleek, modern look✅ Yes
Tub-to-shower conversionHigh – adds usable spaceHigh – easier access, modern design✅ Yes
Neutral coloursModerate – visual space gainHigh – bright, airy feel✅ Yes
Freestanding tubLow – requires more roomHigh – spa-like luxury❌ No

“In small condo bathrooms, every inch matters. The right fixtures and colours can turn a cramped space into a bright, functional room that feels twice its size.” – Kendall, Interior Designer at RenoDuck

Design Options: From Powder Room to Full Spa

Every condo has different bathroom needs. Some owners prefer a simple powder room renovation, while others invest in spa-inspired retreats.

Powder Room Renovation

  • Compact sinks and vanities.
  • Space-efficient toilets.
  • Bold wallpaper or accent lighting for a stylish touch.

Tub-to-Shower Conversion

One of the most common upgrades in condos is replacing a bathtub with a walk-in shower. Benefits include:

  • Easier access and improved safety.
  • Modern, minimalist appearance.
  • More floor space in small bathrooms.

Spa-Inspired and Modern Condo Bathroom Ideas

For those with more square footage:

  • Heated floors and towel warmers.
  • Rainfall showerheads and built-in seating.
  • Freestanding tubs (where space allows).

Whether it’s a powder room or a full spa, condo renovations must balance style with functionality. The best results come from designs that respect condo rules while delivering comfort.

Costs of Condo Bathroom Renovations in Toronto

The cost of a condo bathroom renovation in Toronto depends on size, materials, and whether plumbing or electrical layouts are being modified. Cosmetic updates can be relatively affordable, while structural changes and luxury finishes increase the budget.

Typical Cost Breakdown

To give homeowners a clearer picture, here’s a breakdown of typical renovation types, their starting costs, and what they usually include:

Renovation TypeAverage Starting Cost (Toronto)Notes
Cosmetic updates (tiles, paint)$5,000 – $10,000Quick refresh, no layout changes
Powder room renovation$12,000 – $18,000Compact projects, fewer fixtures
Tub-to-shower conversion$15,000 – $25,000Includes plumbing adjustments
Full 3-piece bathroom$20,000 – $30,000+Most common condo project
Luxury spa-style bathroom$35,000 – $50,000+Premium finishes, heated floors, custom cabinetry
Stat fact: According to HPAC Magazine, Canada’s renovation prices increased by 66.5% since 2017 due to rising material and labour costs. This trend means today’s condo bathroom renovations are significantly more expensive than even a few years ago — and costs are expected to keep climbing.

Factors That Influence the Cost

Several elements determine the final price of a condo bathroom renovation:

  • Size of the space – smaller bathrooms are cheaper, but compact layouts may require custom fixtures.
  • Material quality – porcelain tiles, quartz countertops, and luxury fixtures add costs.
  • Plumbing and electrical work – moving drains or wiring significantly increases expenses.
  • Condo board requirements – additional approvals, deposits, and waste management rules can add to the budget.
  • Labour rates – skilled trades in Toronto often charge more than in surrounding regions.

Budgeting for a condo bathroom renovation requires more than just checking average prices. Toronto homeowners should plan for higher labour rates and stricter condo board requirements, while those in the GTA may find more competitive pricing. Either way, clear planning and contractor expertise are key to keeping costs predictable.

Common Condo Bathroom Renovation Challenges and How to Avoid Them

Renovating a condo bathroom is rewarding, but it comes with unique challenges compared to freehold homes.

Frequent Issues

  • Board restrictions: Condo boards often have lengthy approval processes. Even if your design is straightforward, delays can occur if forms are incomplete or meetings are scheduled infrequently.
  • Noise complaints: Work hours are tightly restricted. Renovations that create dust and drilling noise must be completed within specific timeframes, or residents may file formal complaints.
  • Hidden plumbing problems: Many condos, especially older buildings, have outdated pipes. Once walls are opened, unexpected leaks, corrosion, or code violations may require immediate and costly repairs.
  • Waste disposal limits: Materials and debris can’t simply be thrown in a dumpster outside. Contractors must use service elevators, schedule removal times, and comply with strict waste-handling rules set by building management.

How to Avoid Problems

  1. Submit all paperwork early – secure condo board approval before scheduling demolition or ordering materials.
  2. Hire experienced contractors – those who specialize in condo renovations know how to navigate approvals and building restrictions.
  3. Inspect plumbing and electrical in advance – a pre-renovation check can uncover risks before they delay the project.
  4. Plan waste removal carefully – coordinate with management so debris handling doesn’t become a bottleneck.

Every condo renovation carries risks, but with careful planning and the right team, most challenges can be predicted and managed. Knowing what to expect and preparing for it turns potential roadblocks into minor adjustments rather than expensive setbacks.

Choosing the Right Bathroom Renovation Contractor for Your Condo

Not every contractor is suited for condo projects. A specialized bathroom renovation contractor for condos will save time, reduce stress, and ensure compliance with regulations.

What to Look For in a Contractor

  • Experience with condos: Ask how many condo projects they’ve completed.
  • Licensing and insurance: Verify that electricians and plumbers are properly certified.
  • Knowledge of condo rules: Contractors should know how to work within building restrictions.
  • References and portfolio: Look for similar projects, especially in small spaces.

Why Condo Experience Matters

Unlike freehold renovations, condos require strict scheduling, careful handling of shared spaces, and proactive communication with management. Contractors without this experience can cause project delays and compliance issues.

Condo projects succeed when contractors communicate well with the condo board and residents. A team that understands approvals, elevator scheduling, and noise restrictions will always deliver smoother results.” – Stas, Project Manager at RenoDuck

FAQ about Condo Bathroom Renovations

Yes, but it depends on your condo’s layout and plumbing access. Adding a bathroom almost always requires condo board approval, permits, and licensed contractors.

  • Walk-in showers instead of tubs.
  • Floating vanities and modern fixtures.
  • Neutral palettes with bold accents.
  • Smart lighting and heated flooring.

Yes, permits are usually required for plumbing and electrical work. In Toronto, electrical permits are issued through the Electrical Safety Authority (ESA).

On average, 2–4 weeks. However, waiting for condo board approvals and permits can extend the timeline.

Yes, but budget renovations often focus on cosmetic updates (painting, fixtures, tile refresh). Major changes like a tub-to-shower conversion or custom cabinetry require more investment.

Making Your Condo Bathroom Renovation a Success

A condo bathroom renovation can completely transform how you use and enjoy your home. Success depends on three key factors: planning realistically, following condo renovation rules, and hiring a contractor who understands the unique challenges of condo projects.

Unlike freehold homes, condos require approvals, permits, and careful coordination with management. Costs can also be higher in Toronto compared to the GTA, and timelines are influenced by board restrictions. Still, with the right approach, even the smallest bathroom can be turned into a modern, functional, and stylish space.

Final takeaway: Treat your renovation as both a design project and a compliance process. When both aspects are managed together, results are smoother, faster, and more cost-effective.

Thinking about renovating your condo bathroom in Toronto or the GTA? RenoDuck’s team of experienced project managers, designers, and contractors are here to help. From permits and board approvals to design and construction, we handle the details so you can focus on enjoying your upgraded space. Contact RenoDuck today to start planning your condo bathroom renovation.

Reno Duck © 2025 All Right Reserved.